Vernon River Structure Replacement

In June of 2022 ICS was awarded the contract to replace a structure under the confederation trail in Vernon River. The original structure was placed in 1929 and was buried over 15 meters below the elevation of the trail. As a part of the work a new steel culvert was installed and the existing stream…

Read More

Summerside West End Development Project

In May of 2002 ICS was awarded the contract to redevelop the Western end of Summerside which included 1200 meters of 36″-72″ concrete storm pipe, 600 lineal meters of shore protection, and a full beach reconstruction.

Read More